anqer.radar
Legacy marine data and rights to publish legacy marine data to include all of Ireland 2026
Description
The next phase of the State’s multi-phase approach to offshore wind delivery has seen a move to a plan-led model that will ensure ORE development and deployment is managed in a planned, strategic, and sustainable way, and enable a balanced equilibrium between achieving ORE objectives, while maintaining environmental protection, the economic well-being of local communities, and consideration of other activities taking place in our shared marine space. In turn, this will provide greater certainty for all maritime users as to where development will be situated. An important step in advancing Phase Two will be the use of forward spatial planning, and specifically the requirement to establish Offshore Renewable Energy (ORE) Designated Areas that will take place according to legislative provisions for Designated Maritime Area Plans (DMAPs) within the Maritime Area Planning (MAP) Act, 2021. This forward spatial planning will take an ecosystem-based approach, in line with EU and national policy, and will inter alia help to guide future investment and decision-making. The National DMAP will provide a spatial planning policy framework for offshore renewable energy deployment around Ireland’s coastline. The development and implementation of the National DMAP is currently underway. It will aim to designate sufficient maritime area to deliver Ireland’s ambition of having 20 GW of offshore renewable energy by 2040. Commencing with the South Coast DMAP, the State is undertaking comprehensive surveying activities through our partners in the Marine Institute (MI) and Geological Survey Ireland (GSI) or private surveyors as required to facilitate potential future offshore renewable energy development. This is taking place through a comprehensive programme of survey activity within the geographical area of each DMAP proposed and/or marine areas identified for offshore wind development within the future DMAPs, and/or marine areas identified for offshore wind development within the final DMAPs approved by the Oireachtas. In addition to the above anticipated programme of survey work, DCEE is seeking to supplement our own existing marine data with existing, high-quality, and unprocessed datasets which have been collected in recent years by private industry. This framework will focus on an all of Ireland approach (Irish Sea, Celtic Sea and Atlantic Ocean) and to potentially focus on other future DMAP areas as required. The maximum number of tenderers that can be placed on the Framework is twenty.
- Contracting authority
- Department of Climate Energy and the Environment
- Authority's seat
- IE061
- Place of performance
- Dublin
- Submission deadline
- 5 November 2026 in 11 days
- Published
- 25 September 2026
- Estimated value
- 30,000,000 EUR
- Procedure
- open
- Portal
- TED · etenders.gov.ie
CPV codes
Contract notice
The original notice on the contracting authority's portal.
Sourcehttps://ted.europa.eu/de/notice/-/detail/661914-2026Tender documents
This tender's documents on the contracting authority's portal.
About the contracting authority
Department of Climate Energy and the Environment currently has 4 open tenders.
More open tenders from Department of Climate Energy and the Environment
- Geological Heritage and Geological Information Systems Services for the development of a National Geoheritage DatasetDeadline 20 Nov 2026
- The supply of Survey Navigation Software and Firmware Licensing, Support and MaintenanceDeadline 29 Oct 2026
- The supply of Hydrographic and Geophysical Survey InstrumentsDeadline 29 Oct 2026
Similar tenders
- Stromlieferung an Kompostwerk Kirchheim u. T. GmbH LZ 01.01.27 bis 31.12.2028Kompostwerk Kirchheim u. T. GmbH vertreten durch EMP Energie GmbH Baden-Württemberg · Kirchheim unter Teck Deadline: 23 Nov 2026 in 29 days
- Erdgaslieferung für die Regiebetriebe des Bezirks Niederbayern in 2027 und 2028Bezirk Niederbayern Hauptverwaltung, Stabsstelle Rechtliche Sonderaufgaben und Grundstücksangelegenheiten, , vertreten durch VEA Beratungs-GmbH Bayern · Kumhausen Deadline: 20 Nov 2026 in 26 days
- Erdgaslieferung an Folkwang Universität der Künste LZ 01.01.27 bis 01.01.30Folkwang Universität der Künste vertreten durch EMP Energie GmbH Nordrhein-Westfalen · Essen Deadline: 23 Nov 2026 in 29 days
- BLB /Z / Standardhandelsprodukte ErdgasBau- und Liegenschaftsbetrieb NRW Zentrale Nordrhein-Westfalen · Düsseldorf Deadline: 20 Nov 2026 in 26 days
- Lieferung von Ökostrom für die Abfallzweckverband Südniedersachsen in 2028 und 2029Abfallzweckverband Südniedersachsen , vertreten durch VEA Beratungs-GmbH Niedersachsen · Friedland Deadline: 23 Nov 2026 in 29 days
- Installation einer Dach-PhotovoltaikanlageStadt Kassel, Hochbau und Gebäudebewirtschaftung Deadline: 20 Nov 2026 in 26 days
- Beschaffung von Kraftstoffen für die Stadtwerke Passau GmbHStadtwerke Passau GmbH Bayern · Passau Deadline: 23 Nov 2026 in 29 days
- Lieferung von Erdgas für die EMiL Entsorgungswirtschaft Minden-Lübbecke AöR in 2028-2029EMiL Entsorgungswirtschaft Minden-Lübbecke AöR Nordrhein-Westfalen · Hille Deadline: 23 Nov 2026 in 29 days