Microtunnel Landfall Vierow

50Hertz Offshore GmbH

Description

As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) power cables and fibre optic cables. The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned. The landfall for the BEI project on the island of Bornholm is not included in the scope of this tender. Furthermore, the delivery and installation of the power cables are not part of this tender either. The landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure.

Contracting authority
50Hertz Offshore GmbH
Authority's seat
Berlin · Berlin
Place of performance
Mecklenburg-Vorpommern · Vorpommern-Greifswald
Submission deadline
—
Published
7 July 2026
Estimated value
—
Procedure
—
Portal
oeffentlichevergabe.de

CPV codes

45230000

Contract notice

The original notice on the contracting authority's portal.

Sourcehttps://oeffentlichevergabe.de/ui/de/search/details?noticeId=06ec6230-4b1a-431e-95e3-80ad665c5475&lotId=LOT-0000

No documents are linked for this tender.

About the contracting authority

50Hertz Offshore GmbH currently has 1 open tender.

More open tenders from 50Hertz Offshore GmbH

All tenders from 50Hertz Offshore GmbH

Similar tenders

More tenders