Description
The Scope of Work shall comprise the following two subsea inspections of the Trianel Windpark Borkum: - Scope of Work 1 (SOW1) - ROV Inspection: Biannual inspection of the foundations and the cable exits to determine the current condition by means of visual recording and measurement. TWB plans to do inspections at 20 tripod locations and one offshore substation site every two years. - Scope of Work (SOW2) - Scour Survey: Biannual survey of scour formation with the aid of bathymetric survey using multibeam echosounder equipment (MBES). The depth profile of the seabed is to be measured in a radius of 50 meters from the centre of the foundation structure. TWB plans to do inspections at 40 tripod locations and one offshore substation site every two years.
- Contracting authority
- Trianel Windkraftwerk Borkum GmbH & Co. KG
- Authority's seat
- Nordrhein-Westfalen · Aachen
- Place of performance
- —
- Submission deadline
- —
- Published
- 22 September 2026
- Estimated value
- —
- Procedure
- —
- Portal
- oeffentlichevergabe.de · dtvp.de
CPV codes
Contract notice
The original notice on the contracting authority's portal.
Sourcehttps://oeffentlichevergabe.de/ui/de/search/details?noticeId=bf4418e5-9a4a-4f37-8e92-15d35b997c43&lotId=LOT-0001Tender documents
This tender's documents on the contracting authority's portal.
About the contracting authority
Trianel Windkraftwerk Borkum GmbH & Co. KG currently has 1 open tender.
All tenders from Trianel Windkraftwerk Borkum GmbH & Co. KGSimilar tenders
- Temporäre Aktivkohlestufe am Wasserwerk MeindorfWahnbachtalsperrenverband Deadline: 20 Nov 2026 in 28 days
- ILI HYRER/HYRELGASCADE Gastransport GmbH Hessen · Kassel
- Evakuierungsarbeiten von Pipelines zum Gastransport, Abfackeln von Restmengen, Inertisieren von Pipelines zum Gastransport Im Rahmen einer nicht abschließenden RahmenvereinbarungGASCADE Gastransport GmbH Hessen · Kassel
- EA - Ball Valves 2.0N.V. Nederlandse Gasunie
- Procurement of SDU and jumper for the LoVe projectHavforskningsinstituttet/ Institute of Marine Research
- Provision of Engineering Design, Permitting Support and Project Management (Owner’s Engineer) Services for the Development of a Natural Gas Transmission Network (Stage 1)NATURAL GAS PUBLIC COMPANY OF CYPRUS Deadline: 15 Dec 2026 in 53 days
- Leitungsvermessung am offenen GrabenVorarlberger Energienetze GmbH
- Marchés maintenance CICM IDF et SE 2027 2032GRDF